Title: McMullen Creek Tributary to Coltsgate Road Sanitary Sewer Replacement Construction
Attachments: 1. Map-McMullen Creek Tributary to Coltsgate Road Sanitary Sewer Replacement Construction
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideoAudio
No records to display.
Title
McMullen Creek Tributary to Coltsgate Road Sanitary Sewer Replacement Construction

Action
Action:
Approve a guaranteed maximum price of $4,726,230 to Park Construction of North Carolina for Design-Build construction services for the McMullen Creek Tributary to Coltsgate Road Sanitary Sewer Replacement project.

Body
Staff Resource(s):
David Czerr, Charlotte Water
Ron Hargrove, Charlotte Water
Carl Wilson, Charlotte Water

Explanation
* Park Construction of North Carolina has developed a guaranteed maximum price (GMP) for construction of the McMullen Creek Tributary to Coltsgate Road sanitary sewer line.
* The construction will upsize the existing 8-inch sanitary sewer line, with 5,500 linear feet of 16 and 12-inch line, and will require tunnel crossings of Fairview Road and construction on Coltsgate Road and Cameron Valley Parkway in Council District 6.
* On January 14, 2019, Council approved a contract with Park Construction of North Carolina for Design-Build design services. Based on the design, a GMP for construction services was developed.
* The project is anticipated to be complete by the second quarter of 2021.

Charlotte Business INClusion
The city negotiates participation for Design-Build contracts after the firm is selected and scopes of work are defined for design and construction services (Part G: Section 2.4 of the Charlotte Business INClusion Policy). Park Construction of North Carolina has committed $781,079 or approximately 16.53% of the total contract for Design-Build construction services to the following certified firms:

* Capstone Civil Engineering, Inc. (MBE, SBE) ($162,000) (material testing, blast monitoring, CCTV inspections)
* AMP Utility Distribution Services, LLC (WBE, SBE) (142,439) (piping, miscellaneous materials)
* Tidemark Land Services (SBE) ($148,619) (survey, construction staking, settlement monitoring)
* Gulf Coast LLC (SBE) $138,000) (easement services)
* Martin Landscaping Company, Inc. (MBE, SBE) ($98,056) (...