File #: 15-11211    Version: 1 Name:
Type: Consent Item Status: Approved
File created: 6/11/2019 In control: City Council Business Meeting
On agenda: 7/22/2019 Final action: 7/22/2019
Title: Bridge Maintenance
Attachments: 1. Bridge Maintenance List 2019

Title

Bridge Maintenance

 

Action

Action                     

Approve a contract in the amount of $1,373,025.25 to the lowest responsive bidder Sloan Construction a Division of Reeves Construction Company for bridge maintenance.

 

Body

Staff Resource(s):

Liz Babson, Transportation

Geoffrey Sloop, Transportation

 

Explanation

§                     The Federal Highway Administration mandates that bridges and culverts be inspected every two years for structural adequacy, safety, and functionality.

§                     The city is responsible for the inspection and maintenance of 205 bridges within city limits.

§                     This contract provides for routine construction and maintenance work to three bridges identified through the inspection process. The bridges are located in Council Districts 2 and 3.

§                     Work may include but is not limited to:

-                     Superstructure replacement,

-                     Concrete pavement repairs,

-                     Asphalt surface sealing, repair, or replacement,

-                     Brush and tree control,

-                     Debris removal,

-                     Soil and erosion repairs,

-                     Barrier rail and hand rail installation and repairs,

-                     Retaining wall repairs and replacement,

-                     Culvert repairs,

-                     Removal, containment, and disposal of the existing materials,

-                     Traffic control, and

-                     Erosion and sediment control.

§                     On June 3, 2019, the city issued an Invitation to Bid; three bids were received.

§                     Sloan Construction was selected as the lowest responsive, responsible bidder.

§                     Maintenance anticipated to occur Summer 2019. 

 

Charlotte Business INClusion

Established MSBE Goal: 10.00%

Committed MSBE Goal:  10.29%

Sloan Construction a Division of Reeves Construction Company met the established MSBE subcontracting goal, and has committed 10.29% ($141,241) of the total contract amount to the following certified firms (Part B: Section 3 of the Charlotte Business INClusion Policy):

§                     Roadmasters Traffic Control LLC (SBE) ($100,000) (traffic control)

§                     Oliver Paving Company (SBE) ($36,830) (asphalt)

§                     Ground Effects, Inc. (SBE) ($4,411) (striping)

 

Fiscal Note

Funding:  Capital Investment Plan

 

Attachments

Attachment(s)

List of Bridges