A. Approve a contract in the amount of $1,326,413 with C Design Inc. for Design Services for the Terminal Building D/E Connector Renovation and Addition project, and
B. Authorize the City Manager to amend the contract consistent with the purpose for which the contract was approved.
Body
Staff Resource(s):
Haley Gentry, Aviation
Jack Christine, Aviation
Explanation
§ The Terminal Building D/E Connector Renovation and Addition (DECO) project will renovate and expand the terminal space that connects Concourses D and E, to improve passenger circulation and provide additional floor space for concessions.
§ The project will include a new mezzanine level for a passenger club, airfield apron work to include new loading docks, storage space, and a reconfiguration of the tug road to maintain connectivity between Concourses C and E.
§ On July 14, 2022, the city issued a Request for Qualifications (RFQ); two responses were received.
§ C Design Inc. is the best qualified firm to meet the city’s needs on the basis of demonstrated competence and qualification of professional services in response to the RFQ requirements.
§ This activity is occurring on airport property.
Charlotte Business INClusion
The city negotiates subcontracting participation after the proposal selection process (Part C: Section 2.1(h) of the Charlotte Business INClusion Policy). C Design Inc. has committed 14.37%
($190,598) of the total contract amount to the following certified firm(s):
§ AME Consulting Engineers (SBE) ($56,400) (mechanical & electrical engineering)
§ Sweetwater Utility Exploration LLC (SBE) ($26,250) (underground utility exploration)
§ Capstone Civil Engineering, Inc. (SBE) ($58,948) (geotech)
§ CES Group Engineers, LLP (WBE) ($49,000) (surveying and 3D laser scanning)
Fiscal Note
Funding: Aviation Capital Investment Plan