File #: 15-7310    Version: 1 Name:
Type: Consent Item Status: Approved
File created: 1/8/2018 In control: City Council Business Meeting
On agenda: 3/26/2018 Final action: 3/26/2018
Title: Charlotte Water Generator Equipment
Attachments: 1. Environmental Services Facility
Title
Charlotte Water Generator Equipment

Action
Action:
A. Approve the purchase of a generator, switchgear, fuel tank, silencer and other integral equipment for standby generator systems from a cooperative purchasing contract as authorized by G.S. 143-129(e)(3) for Charlotte Water facilities,

B. Approve a unit price contract with Carolina Tractor & Equipment Company for the purchase of one 750 kW standby generator including switchgear, fuel tank, silencer and other integral equipment, necessary for the generator systems for a term of one year under National Joint Powers Alliance Contract No. 080613-CAT dated September 17, 2013, and

C. Approve a contract with Carolina Tractor & Equipment Company for a 10 year term for the preventative maintenance of one 750 kW generator.

Body
Staff Resource(s):
Angela Lee, Charlotte Water
Ron Hargrove, Charlotte Water

Cooperative Purchasing Exemption
NC S.L. 2001-328, effective January 1, 2002, authorizes competitive group purchasing.

Explanation
* In June 2017, a Preliminary Engineering Report recommended that additional standby power capacity be added to the Environmental Services Facility (ESF) existing generator backup. The current generator does not provide sufficient power for the entire facility to run in the event of a power failure. Operation of the lab facility (City Council District 3) during times of power outage and other emergency are paramount to public health in the greater Charlotte area.
* Carolina Tractor & Equipment Company is the local authorized dealer for a contract awarded to Caterpillar Inc. by the National Joint Powers Alliance (NJPA) that offers competitively obtained contracts to public agencies nationwide (i.e. for utilities applications, public safety, etc).
* Pre-purchasing this generator through the NJPA contract will reduce construction time by as much as three to four months, as well as provide at least a 36 percent discount on the generator.
* G.S. 143-129 ( e) (3) allows local g...