Title
Lorna-Laburnum Storm Drainage Improvement Project
Action
Action:
A. Approve contract amendment #2 for $735,000 to the contract with The Isaacs Group, PC for design and construction administration services, and
B. Authorize the City Manager to amend the contract consistent with the purpose for which the contract and this amendment were approved.
Body
Staff Resource(s):
Angela Charles, Charlotte Water
Mike Davis, Storm Water Services
Matthew Gustis, Storm Water Services
Explanation
§ This project, with boundaries of Westover Street to the north, Briar Creek to the south, Chesterfield Avenue to the east, and Kingsbury Drive to the west, will address aging infrastructure and reduce flooding in Council District 1.
§ On December 20, 2021, following a competitive solicitation process, the city entered into a contract with The Isaacs Group, PC for $375,000 for planning services for the Lorna-Laburnum Storm Drainage Improvement Project.
- Amendment #1 was to modify the term of the contract and did not impact the total contract value.
§ As intended upon the successful completion of planning services, an amendment is needed to add design and construction phase administration services for the project.
§ Specific design and construction administration tasks include, but are not limited to:
- Design of repairs and/or improvements,
- Survey and utility locate services,
- Geotechnical subsurface investigations,
- Preparation of construction documents, and
- Construction administration.
§ The new estimated value of the contract including this amendment is $1,110,000.
Charlotte Business INClusion
Isaacs Group, PC has committed 17.78% ($130,685) of the contract amendment to the following certified firm(s):
§ Barry Lambert Engineering, PC (SBE) ($37,295) (structural engineering services)
§ Capstone Civil Engineering, Inc. (MBE) ($68,860) (geotechnical and subsurface investigations and reporting)
§ Center Line Locating, LLC (WBE, SBE) ($24,530) (underground utility location services)
Fiscal Note
Funding: Stormwater Capital Investment Plan
Attachments
Attachment(s)
Map