Title: Water Transmission Main Assessment and Repairs
Attachments: 1. Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideoAudio
No records to display.

Title

Water Transmission Main Assessment and Repairs

 

Action

Action:

Approve a guaranteed maximum price of $1,307,345 to State Utility Contractors, Inc. for Design-Build construction services for the Water Transmission Main Improvements and Repairs project. 

 

Body

Staff Resource(s):

Angela Charles, Charlotte Water

David Czerr, Charlotte Water

Carl Wilson, Charlotte Water

 

Explanation

§                     State Utility Contractors, Inc. has developed a guaranteed maximum price (GMP) for construction of water main connections at Carmel and Pineville-Matthews Roads and point repairs to the 24-inch water main along Peachtree, Sunset, and Old Statesville Roads (Council Districts 2 and 7).

§                     This contract includes design services and development of a GMP for construction of additional projects outlined in the Water Transmission Main Improvements and Repairs project.

§                     On June 8, 2020, City Council approved a contract with State Utility Contractors, Inc. for Design-Build design services. Based on the design, a GMP for construction services was developed.

§                     This project segment is anticipated to be complete by third quarter 2021.

§                     Requests for the approval of additional GMPs for various project segments will be presented to City Council in the future.

 

Charlotte Business INClusion

The city negotiates participation for Design-Build contracts after the firm is selected and scopes of work are defined for design and construction services (Part G: Section 2.7 of the Charlotte Business INClusion Policy). State Utility Contractors, Inc. has committed $240,500 or approximately 18.40% of the total contract for Design-Build construction services to the following certified firms:

§                     AMP Utility Distribution Services LLC (WBE, SBE) ($70,000) (water main material supply)

§                     GDC Supplies Equipment & Contracting, LLC (MBE, SBE) ($63,000) (traffic control)

§                     Stewart Engineering, Inc. (MBE) ($40,000) (field surveying and subsurface utility engineering)

§                     Ram Pavement Services Inc. (SBE) ($30,000) (asphalt paving and patching)

§                     Yellow Duck Marketing (WBE, SBE) ($20,000) (advertising, marketing, and public relations)

§                     Fernandez Construction Corporation (SBE) ($7,500) (concrete sidewalk and curb)

§                     Buffkin Trucking, Inc. (MBE, SBE) ($5,000) (hauling)

§                     Gavel & Dorn Engineering (SBE) ($5,000) (material testing)

 

Fiscal Note

Funding: Charlotte Water Capital Investment Plan

 