File #: 15-19485    Version: 1 Name:
Type: Consent Item Status: Approved
File created: 1/3/2023 In control: City Council Business Meeting
On agenda: 2/13/2023 Final action: 2/13/2023
Title: Professional Engineering Services for Toomey-Distribution Storm Drainage Improvement Project

Title

Professional Engineering Services for Toomey-Distribution Storm Drainage Improvement Project

 

Action

Action:

A.                     Approve a contract for up to $580,000 with Woolpert North Carolina, PLLC for design services for the Toomey-Distribution Storm Drainage Improvement Project, and

 

B.                     Authorize the City Manager to amend the contract consistent with the purpose for which the contract was approved.

 

Body

Staff Resource(s):

Angela Charles, Charlotte Water

Mike Davis, Storm Water Services

Matt Gustis, Storm Water Services

 

Explanation

§                     The Toomey-Distribution Storm Drainage Improvement Project is bordered by Rampart Street to the north, Remount Road to the south, Dunavant Street to the east, and Remus Road to the west, and is located in Council District 3.

§                     Professional engineering services will evaluate infrastructure and customer requests to determine and design needed improvements to the existing drainage system.

§                     Specific design tasks include, but are not limited to:

-                     Design of repairs and/or improvements;

-                     Survey and utility locate services;

-                     Geotechnical subsurface investigations;

-                     Preparation of construction documents;

-                     Construction administration; and

-                     Public outreach activities.

§                     On August 23, 2019, the city issued a Request for Qualifications (RFQ); 35 responses were received. 20 firms were selected to receive contracts.

§                     Woolpert North Carolina, PLLC was among those selected as the best qualified firms to meet the city’s needs on the basis of demonstrated competence and qualification of professional services in response to the RFQ requirements.

§                     Additional contracts from this RFQ process will be coming to City Council for consideration once the projects are defined.

 

Charlotte Business INClusion

The city negotiates subcontracting participation after the proposal selection process (Part C: Section 2.1 (h) of the Charlotte Business INClusion Policy).  Woolpert North Carolina, PLLC has committed $102,560 or approximately 17.68% of the total contract amount to the following certified firms:

§                     Hinde Engineering (SBE) ($44,225) (utility coordination/design)

§                     CES Group Engineers, LLC (WBE) ($26,620) (surveying services)

§                     RDL Utility Exploration (MBE, SBE) ($20,000) (horizontal/vertical underground utility locating)

§                     Boyle Engineering (SBE) ($11,715) (geotechnical engineering)

 

 

Fiscal Note

Funding:  Storm Water Capital Investment Plan