Title: Airport Fuel Line Repairs Design Amendment

Title

Airport Fuel Line Repairs Design Amendment

 

Action

Action:

A.                     Approve contract amendment for $156,000 to the contract with Delta Airport Consultants, Inc. for Fixed Base Operator Fuel Line Repairs Design Contract, and

 

B.                     Authorize the City Manager to amend the contract consistent with the purpose for which the contract was approved.

 

Body

Staff Resource(s):

Haley Gentry, Aviation

Jack Christine, Aviation

 

Explanation

§                     This contract provides design and bidding phase engineering services for the work required to replace the fuel lines serving the fuel dispensing cabinets at the Airport Fixed Base Operator (FBO), Wilson Air Center.

§                     This activity is occurring on Airport property located in Council District 3.

§                     This amendment provides additional design services required to connect the existing tenant fuel tanks to the FBO fuel farm, remove tenant fuel lines from the existing design, and include sustainable aviation fuel lines for future use.

§                     On March 20, 2020, the city issued a Request for Proposals (RFP); thirteen proposals were received.

§                     Delta Airport Consultants, Inc. was selected as the lowest responsive, responsible bidder.

§                     The total value of this contract including this amendment is $562,000.

 

Charlotte Business INClusion

All additional work involved in this amendment will be performed by Delta Airport Consultants, Inc. and their existing subcontractor(s) (Part D: Section 6 of the Charlotte Business INClusion Policy).

 

Fiscal Note

Funding:  Aviation Capital Investment Plan