Title
South Boulevard Water Main Construction
Action
Action:
Approve a guaranteed maximum price of $18,162,932.20 to R.H. Price, Inc. for Design-Build construction services for the South Boulevard Water Main project.
Body
Staff Resource(s):
David Czerr, Charlotte Water
Ron Hargrove, Charlotte Water
Carl Wilson, Charlotte Water
Explanation
§ R.H. Price, Inc. has developed a guaranteed maximum price (GMP) for construction to increase the size of the water main serving the rapidly expanding and growing South Boulevard corridor, in Council Districts 1 and 3, between Scaleybark Drive and Worthington Drive.
§ On October 10, 2018, Council approved a contract with R.H. Price, Inc. for Design-Build design services. Based on the design, a GMP for construction services was developed.
§ The project is anticipated to be complete by the third quarter of 2021.
Charlotte Business INClusion
The city negotiates participation for Design-Build contracts after the firm is selected and scopes of work are defined for design and construction services (Part G: Section 2.4 of the Charlotte Business INClusion Policy). R.H. Price has committed $1,880,000 or approximately 10.35% of the total contract for Design-Build design services to the following certified firms:
§ Trull Contracting, LLC (WBE, SBE) ($1,060,000) (paving)
§ GDC Supplies Equipment & Contracting LLC (MBE, SBE) ($675,000) (traffic control)
§ Capstone Civil (MBE, SBE) ($75,000) (testing)
§ MTS Trucking, LLC (MBE, SBE) ($70,000) (hauling)